top of page

The Proposal

Pegasus Group are currently preparing an application to develop the site south of the A6/Cranford Road roundabout, north of the Seasons Garden Centre into a new foodstore.

 

The new store will feature a high-quality design, including an attractive glazed frontage.

 

A new access road, providing access for vehicles and pedestrians will be created off Cranford Road.

The new Lidl store will have a sales area of 1,512sq.m which will showcase Lidl’s full range of award-winning, great value products. The foodstore will include self-checkouts, a customer toilet and a dedicated bakery. In total, 120 parking spaces will be provided, with six disabled parking bays, nine parent & child spaces and six EV charging spaces. Safe and secure covered bicycle parking will also be provided close to the store entrance. The proposal also includes roof mounted solar panels, which will contribute towards the store’s energy needs.

It is proposed that the Lidl store will be open from:

  • 8am to 10pm Monday to Saturday (including Bank Holidays); and

  • 10am to 4pm Sundays.

The store would typically receive a maximum of two deliveries per day. All store waste will be stored internally within the warehouse area and will be collected by the delivery vehicle, minimising HGV movements within the site and surrounding area.

8311L-08A.jpg
BENEFITS OF THE PROPOSED DEVELOPMENT

The new Lidl store will provide the following benefits to the local area:

A store that will provide a clean and new shopping experience to meet the needs of customers​

A dedicated in-store bakery and a commitment to providing food from sustainable sources

Improved shopping choice and provision of a new mainstream discount foodstore​

A high-quality building design that will complement the surrounding area​

​Rapid electric vehicle charging points​

​Solar panels to provide a sustainable source of energy for the store​

​Up to 40 new jobs for local people in line with Living Wage Foundation rate for all eligible employees and no zero hours contracts

​Landscaping throughout the site

SITE PLAN - DOWNLOAD
8311L-20D.jpg
PUBLIC CONSULTATION LEAFLET - DOWNLOAD
bottom of page